Affirm Technical Services Ltd

Case Study:

St Margret’s Hospital, Epping

Case Study

Affirmtech Case Study St Margrets Hospital

Project: St Margret’s Hospital, Epping – Electrical Installation

The 400A Glasgow switch with 400A linking plates from UKPN’s 400A cut-out serves as a critical element in isolating the main power supply. 

1. Isolation of the main supply: Without this switch, isolating the main power supply would require a call-out from UKPN (UK Power Networks), which would incur an additional charge. The Glasgow switch provides a convenient and local means to isolate the supply without the need for external assistance.

2. Black Start Generator Testing: Black start refers to the process of restarting a power system after a total shutdown. For regular monthly generator testing, it’s important to have a reliable means of testing the backup generator system to ensure that it can power up the system independently if needed. The 400A switch allows you to conduct these tests effectively, ensuring that the generator system works as intended in case of a power outage.

Gallery

All Case Studies

Loading...